Loft Conversion E9 Bathroom | High-end Finish | East London

High-end finish to bathroom in loft conversion, Hackney E9

Related Case Study

Location:

Hackney, East London, E9

Type of Conversion:

Rear Dormer, 1 bed, 1 bath

Duration of Build:

12 weeks

Background:

Soaring house prices and the cost-of-living crisis means that children are living at home with parents for longer. With three children at home, our clients wanted to make more space in their Hackney home with a loft conversion. After Absolute Lofts surveyed the mid-terrace property, we concluded it was the ideal fit for a rear dormer loft extension.

View case study
Hackey dormer conversion E9. Mid-century modern style bedroom with hardwood flooring